AS9100D Consulting That Gets You Certified — Not Just Documented
I help aerospace and defense suppliers in Turkey — and globally — with AS9100 implementation, gap analysis and audit readiness. The result is a process-based quality management system that survives both your certification audit and your customer’s audit, not a binder of templates.
I reply within 12 hours with your top 3 gaps.
What is AS9100D Consulting?
AS9100D consulting is hands-on help to implement, document and prove an aerospace quality management system so it passes both certification and customer audits. Aerospace and defense OEMs do not accept an ISO 9001 certificate as proof that a supplier can control configuration, product safety and traceability. AS9100D — the aerospace quality management system standard, known as EN 9100 in Europe — is what closes that gap. Yet audit after audit, the suppliers who struggle are not the ones with thin manuals; they are the ones whose system is written down but not lived. My work is to make the system real: every requirement tied to a process, every process tied to a record, so that whatever an auditor asks to see, you can show it. That is the difference between being documented and being certified.
Why Suppliers Fail AS9100 Audits
Most failed aerospace QMS audits are not about missing documents — they are about systems that look compliant on paper but cannot show objective evidence under questioning. These are the three major nonconformities I see most often, and each one can stop a certification audit in its tracks.
Risk that lives only on paper
A risk register exists, but there is no evidence that risk-based thinking (AS9100D 8.1.1) actually drives operational controls, actions or decisions. The system is documented, not operated — and that is written up as a major nonconformity.
No configuration or product safety control
There is no configuration management baseline (8.1.2) and no product safety process (8.1.3). For aerospace hardware this is a systemic gap, and it routinely becomes a major finding at the Stage 2 audit.
Incomplete AS9102 and counterfeit-parts controls
First Article Inspection records are missing or incomplete and there is no counterfeit parts prevention process (8.1.4). Your OEM flow-down requirements are not demonstrably met, so the audit effectively stops here.
Our AS9100 Services: Gap Analysis, Documentation & Audit Readiness
A complete aerospace quality management system — covering risk-based thinking, configuration management, product safety, counterfeit parts prevention and human factors — delivered as six connected workstreams rather than a stack of disconnected documents. You can take all six, or start with the gap analysis and build from there.
Gap Analysis
We benchmark your current system against every AS9100D clause and your OASIS profile, then quantify the gap to certification so you know exactly what Stage 1 and Stage 2 auditors will look for.
Process Map & Documentation
We turn your real workflow into turtle diagrams and a SIPOC interaction map, then build the documented information, procedures and records on top of it — documentation that mirrors how you actually work, not a generic template. No obsolete mandatory-manual box-ticking; the standard asks for documented information and process evidence, and that is what we produce.
Risk, Configuration & Product Safety
We implement the AS9100D controls ISO 9001 never asked for: operational risk-based thinking (8.1.1), configuration management (8.1.2) and a dedicated product safety process (8.1.3).
AS9102 FAI Integration
First Article Inspection is where many aerospace suppliers lose their customer’s trust. We integrate AS9102 FAI into your production release so first-article records are complete, traceable and audit-ready.
Internal Audit & Training
We train your internal auditors and run the first full internal audit cycle, so nonconformities are found and closed by you — before the certification body or your OEM finds them.
Stage 1 & Stage 2 Readiness
We prepare the evidence pack, rehearse the audit and liaise with your certification body, then support you through Stage 1, Stage 2 and the closure of any findings.
AS9100 Implementation Roadmap
A four-step path from gap analysis to a certified, audit-ready system — each step produces evidence, not just documents. Where it is safe to overlap workstreams we do, so you are not waiting on one stage to begin the next.
Diagnostic
1 week. We review your current QMS, OASIS profile and any customer SCARs to size the real gap to AS9100.
Build
3-6 weeks. We build the processes, risk-based thinking and operational controls your OEM and the standard require.
Prove
2-4 weeks. Internal audit, management review and at least three months of records that show the system actually runs.
Certify
Certification body liaison, Stage 1 / Stage 2 support and closure of any nonconformities until you are certified.
The Differences You Have to Close
If you already hold ISO 9001, these are the aerospace-specific requirements AS9100D (Rev D) adds on top — and where most ISO-only suppliers pick up their major findings. Close them, and the certificate becomes an upgrade of your existing system rather than a second one running in parallel.
| Requirement | ISO 9001:2015 | AS9100D |
|---|---|---|
| Risk-based thinking | Required at process level | Extended to operational risk and special requirements (8.1.1) |
| Configuration management | Not required | Required (8.1.2) |
| Product safety | Not addressed | Dedicated requirement (8.1.3) |
| Counterfeit parts prevention | Not addressed | Required (8.1.4) |
| Human factors | Not addressed | Required in nonconformity and corrective action |
| First Article Inspection | Not required | Required per AS9102 |
| OASIS database | Not applicable | Mandatory registration and audit reporting |
| Customer / OEM flow-down | General requirement | Explicit statutory, regulatory and customer-specific flow-down |
Deliverables
At the end of the engagement these are the tangible outputs in your hands — the working system your certification body and your OEM will audit, with the records that prove each part of it runs.
A clause-by-clause AS9100D gap report with a prioritized action plan
Documented information, procedures and a process interaction map tailored to your operation
Risk register, configuration management plan and product safety procedure
AS9102 First Article Inspection templates integrated into production release
Trained internal auditors and a completed internal audit with corrective actions
Management review pack and KPIs (on-time delivery, nonconformity, scrap)
A Stage 1 / Stage 2 readiness pack and certification-body liaison
A Supply-Chain Insider, Not a Generic ISO Consultant
I am a management systems consultant who has spent 20+ years inside aerospace and defense supply chains. I have worked on programs for Turkey’s primes — TUSAŞ, TEI, ASELSAN, Baykar, STM and ROKETSAN — and their suppliers, implementing AS9100 / EN 9100 across product, production and quality processes, and I have been on both sides of OEM audits.
That experience is the difference between a certificate and a certificate that keeps you on the approved vendor list. A project with me is grounded in how your customers actually audit — first article inspection, configuration control, product safety and counterfeit parts prevention — so you pass the certification audit and the customer audit that follows. I work with suppliers in Turkey and internationally, on site and remotely, and I stay with you through the certification audit rather than handing over a binder and leaving.
20+ years in aerospace and defense supply chains
Project experience across TUSAŞ, TEI, ASELSAN, Baykar, STM and ROKETSAN programs
AS9100 / EN 9100 implementations in product, production and quality processes
Hands-on with OEM audits, supplier development (EYDEP) and first article inspection
Frequently Asked Questions
How long does AS9100 implementation take?+
Can we keep our ISO 9001 certificate?+
What is OASIS and do we need to register?+
Do you provide AS9100 internal auditor training?+
What is the difference between AS9100, AS9110 and AS9120?+
Do you work with suppliers outside Turkey?+
Related Pages
AS9100 Guides & Services
AS9100 Gap Analysis AS9100 vs ISO 9001 AS9100 Documentation AS9100 Internal Audit & Auditor Training ISO 9001 Quality Management Consulting Contact / Request a CallAS 9100 In Depth (Türkçe)
AS 9100 Danışmanlığı (Türkçe) AS 9100 Nedir? AS 9100 Belgelendirme Tetkiki FAI / First Article Inspection (AS9102)Get certified without surprises at the audit
Let’s start with an AS9100 gap analysis. I’ll map your current system to AS9100D and your customer’s requirements, then give you a realistic roadmap to certification — in Turkey or wherever you operate.
Siteye eklediğim yeni sayfaları ve bilgilendirmeleri e-posta ile paylaşıyorum. Dilediğiniz an tek tıkla ayrılabilirsiniz.
![]()