AS9100D Consulting for Aerospace Suppliers

Türkçe

AS9100D / EN 9100 · Aerospace & Defense

AS9100D Consulting That Gets You Certified — Not Just Documented

I help aerospace and defense suppliers in Turkey — and globally — with AS9100 implementation, gap analysis and audit readiness. The result is a process-based quality management system that survives both your certification audit and your customer’s audit, not a binder of templates.

I reply within 12 hours with your top 3 gaps.

PROCESSAS9100D QMSCONTROLSAS9100D · Customer ReqMECHANISMSPeople · EquipmentINPUTSMaterial · SpecsOUTPUTCompliant Product
20+
Years Aerospace QMS
AS9100D
Rev D · EN 9100
4
Step Roadmap
3-6 mo
Typical to Certification
The Basics

What is AS9100D Consulting?

AS9100D consulting is hands-on help to implement, document and prove an aerospace quality management system so it passes both certification and customer audits. Aerospace and defense OEMs do not accept an ISO 9001 certificate as proof that a supplier can control configuration, product safety and traceability. AS9100D — the aerospace quality management system standard, known as EN 9100 in Europe — is what closes that gap. Yet audit after audit, the suppliers who struggle are not the ones with thin manuals; they are the ones whose system is written down but not lived. My work is to make the system real: every requirement tied to a process, every process tied to a record, so that whatever an auditor asks to see, you can show it. That is the difference between being documented and being certified.

Why Audits Fail

Why Suppliers Fail AS9100 Audits

Most failed aerospace QMS audits are not about missing documents — they are about systems that look compliant on paper but cannot show objective evidence under questioning. These are the three major nonconformities I see most often, and each one can stop a certification audit in its tracks.

Major NC

Risk that lives only on paper

A risk register exists, but there is no evidence that risk-based thinking (AS9100D 8.1.1) actually drives operational controls, actions or decisions. The system is documented, not operated — and that is written up as a major nonconformity.

Major NC

No configuration or product safety control

There is no configuration management baseline (8.1.2) and no product safety process (8.1.3). For aerospace hardware this is a systemic gap, and it routinely becomes a major finding at the Stage 2 audit.

Major NC

Incomplete AS9102 and counterfeit-parts controls

First Article Inspection records are missing or incomplete and there is no counterfeit parts prevention process (8.1.4). Your OEM flow-down requirements are not demonstrably met, so the audit effectively stops here.

What We Do

Our AS9100 Services: Gap Analysis, Documentation & Audit Readiness

A complete aerospace quality management system — covering risk-based thinking, configuration management, product safety, counterfeit parts prevention and human factors — delivered as six connected workstreams rather than a stack of disconnected documents. You can take all six, or start with the gap analysis and build from there.

Gap Analysis

We benchmark your current system against every AS9100D clause and your OASIS profile, then quantify the gap to certification so you know exactly what Stage 1 and Stage 2 auditors will look for.

Process Map & Documentation

We turn your real workflow into turtle diagrams and a SIPOC interaction map, then build the documented information, procedures and records on top of it — documentation that mirrors how you actually work, not a generic template. No obsolete mandatory-manual box-ticking; the standard asks for documented information and process evidence, and that is what we produce.

Risk, Configuration & Product Safety

We implement the AS9100D controls ISO 9001 never asked for: operational risk-based thinking (8.1.1), configuration management (8.1.2) and a dedicated product safety process (8.1.3).

AS9102 FAI Integration

First Article Inspection is where many aerospace suppliers lose their customer’s trust. We integrate AS9102 FAI into your production release so first-article records are complete, traceable and audit-ready.

Internal Audit & Training

We train your internal auditors and run the first full internal audit cycle, so nonconformities are found and closed by you — before the certification body or your OEM finds them.

Stage 1 & Stage 2 Readiness

We prepare the evidence pack, rehearse the audit and liaise with your certification body, then support you through Stage 1, Stage 2 and the closure of any findings.

Not sure where your AS9100 gaps are? Start with a structured gap assessment.

Request a Gap Assessment
How We Work

AS9100 Implementation Roadmap

A four-step path from gap analysis to a certified, audit-ready system — each step produces evidence, not just documents. Where it is safe to overlap workstreams we do, so you are not waiting on one stage to begin the next.

1

Diagnostic

1 week. We review your current QMS, OASIS profile and any customer SCARs to size the real gap to AS9100.

2

Build

3-6 weeks. We build the processes, risk-based thinking and operational controls your OEM and the standard require.

3

Prove

2-4 weeks. Internal audit, management review and at least three months of records that show the system actually runs.

4

Certify

Certification body liaison, Stage 1 / Stage 2 support and closure of any nonconformities until you are certified.

AS9100D vs ISO 9001

The Differences You Have to Close

If you already hold ISO 9001, these are the aerospace-specific requirements AS9100D (Rev D) adds on top — and where most ISO-only suppliers pick up their major findings. Close them, and the certificate becomes an upgrade of your existing system rather than a second one running in parallel.

RequirementISO 9001:2015AS9100D
Risk-based thinkingRequired at process levelExtended to operational risk and special requirements (8.1.1)
Configuration managementNot requiredRequired (8.1.2)
Product safetyNot addressedDedicated requirement (8.1.3)
Counterfeit parts preventionNot addressedRequired (8.1.4)
Human factorsNot addressedRequired in nonconformity and corrective action
First Article InspectionNot requiredRequired per AS9102
OASIS databaseNot applicableMandatory registration and audit reporting
Customer / OEM flow-downGeneral requirementExplicit statutory, regulatory and customer-specific flow-down
What You Get

Deliverables

At the end of the engagement these are the tangible outputs in your hands — the working system your certification body and your OEM will audit, with the records that prove each part of it runs.

  • A clause-by-clause AS9100D gap report with a prioritized action plan

  • Documented information, procedures and a process interaction map tailored to your operation

  • Risk register, configuration management plan and product safety procedure

  • AS9102 First Article Inspection templates integrated into production release

  • Trained internal auditors and a completed internal audit with corrective actions

  • Management review pack and KPIs (on-time delivery, nonconformity, scrap)

  • A Stage 1 / Stage 2 readiness pack and certification-body liaison

Why Cem Seçim

A Supply-Chain Insider, Not a Generic ISO Consultant

I am a management systems consultant who has spent 20+ years inside aerospace and defense supply chains. I have worked on programs for Turkey’s primes — TUSAŞ, TEI, ASELSAN, Baykar, STM and ROKETSAN — and their suppliers, implementing AS9100 / EN 9100 across product, production and quality processes, and I have been on both sides of OEM audits.

That experience is the difference between a certificate and a certificate that keeps you on the approved vendor list. A project with me is grounded in how your customers actually audit — first article inspection, configuration control, product safety and counterfeit parts prevention — so you pass the certification audit and the customer audit that follows. I work with suppliers in Turkey and internationally, on site and remotely, and I stay with you through the certification audit rather than handing over a binder and leaving.

  • 20+ years in aerospace and defense supply chains

  • Project experience across TUSAŞ, TEI, ASELSAN, Baykar, STM and ROKETSAN programs

  • AS9100 / EN 9100 implementations in product, production and quality processes

  • Hands-on with OEM audits, supplier development (EYDEP) and first article inspection

FAQ

Frequently Asked Questions

How long does AS9100 implementation take?+
For most SMEs a realistic AS9100 implementation and audit readiness timeline is three to six months. It depends on the maturity of your current quality management system and how quickly real process records can be produced. We set the timeline after the diagnostic step, not before.
Can we keep our ISO 9001 certificate?+
Yes. AS9100D is built on ISO 9001:2015, so an existing ISO 9001 system is an upgrade path rather than a restart. We extend it with the aerospace-specific requirements and migrate you to a single certificate, so you are not maintaining two management systems at once.
What is OASIS and do we need to register?+
OASIS is the aerospace quality certification database. Your certification body reports the audit and your certification status there, so correct OASIS handling is part of a complete project, not an afterthought. We make sure your scope, sites and certificate data are represented correctly.
Do you provide AS9100 internal auditor training?+
Yes. Internal auditor training and running the first internal audit cycle are part of the engagement. The standard and your customers expect objective audit evidence before the certification audit, and trained internal auditors are how you produce it.
What is the difference between AS9100, AS9110 and AS9120?+
AS9100 covers aviation, space and defense manufacturers, AS9110 covers maintenance (MRO) organizations and AS9120 covers stockist distributors. Most suppliers need AS9100; we confirm the right scheme in the diagnostic step. Choosing the wrong one can waste months, so it is settled before any documentation work begins.
Do you work with suppliers outside Turkey?+
Yes. I am based in Turkey and work with aerospace and defense suppliers both locally and internationally, including remote AS9100 and EN 9100 implementation and audit-readiness support for suppliers in Europe and beyond.

Ready to size the gap to AS9100 certification?

Request a Gap Assessment

Get certified without surprises at the audit

Let’s start with an AS9100 gap analysis. I’ll map your current system to AS9100D and your customer’s requirements, then give you a realistic roadmap to certification — in Turkey or wherever you operate.

📩 Yeni içeriklerden haberdar olun

Siteye eklediğim yeni sayfaları ve bilgilendirmeleri e-posta ile paylaşıyorum. Dilediğiniz an tek tıkla ayrılabilirsiniz.

Doğrulama sorusu Lütfen resimdeki toplama işleminin sonucunu yazın.

Onay sonrası doğrulama e-postası info@isletmeakademisi.com adresinden gönderilir.

Loading

Ö
ÖNE ÇIKAN
EYDEP Firma Listesi ve EYDEP Firmaları 2026
Güncel EYDEP firma listesi nasıl görülür? 2024'te 860 EYDEP sertifikalı firma var. 2025-2026 ödüllü firmalar, A/B seviyesi örnekler ve YETEN portal başvuru adım
İçeriği Oku →
Ö
ÖNE ÇIKAN
İşletme Akademisi
Isletme Akademisi: Yalin uretim, kalite yonetim sistemleri (IATF 16949, AS 9100) ve DDX dijital donusum danismanligi. KOBIler icin pratik cozumler.
İçeriği Oku →
S
SAYFA
Savunma ve Havacılıkta Alt Yüklenici ve Tedarik Yönetimi Çalıştayı Sunumları
SSB Savunma ve Havacılıkta Alt Yüklenici ve Tedarik Yönetimi Çalıştayı'nda sunulan 173 sayfalık sunumları online görüntüleyin veya indirin.
İçeriği Oku →
S
SAYFA
Marka ve TURQUALITY® Genelgesi 2026: Yeni Düzenlemede Neler Değişti?
30 Ekim 2026'da yürürlüğe giren yeni Marka ve TURQUALITY® Genelgesi: ihracata bağlı destek tavanı, 5M/15M USD giriş kriterleri ve yazılımda TÜR Belgesi şartı.
İçeriği Oku →
S
SAYFA
DDX Değerlendirici ve Danışman Listesi: Doğru Kişiyi Seçme Rehberi
DDX değerlendirici mi arıyorsunuz? TÜBİTAK TÜSSİDE belgeli DDX değerlendiricisi olarak dijital olgunluk değerlendirmenizi yapıp DDX raporunuzu hazırlıyorum.
İçeriği Oku →
Ö
ÖNE ÇIKAN
EYDEP Danışmanlık Hizmetleri
EYDEP danışmanlık: savunma sanayii tedarikçileri için endüstriyel yetkinlik değerlendirmesine hazırlık, denetim desteği ve seviye yükseltme. AS 9100 ile entegre
İçeriği Oku →
Ö
ÖNE ÇIKAN
Savunma Sanayi Fuarları 2026-2027
Savunma sanayi fuarları 2026-2027 takvimi. IDEF 2027, SAHA EXPO 2026, ADEX 2026 Bakü, DMME 2027 Katowice ve tüm savunma fuarları tarih, yer ve katılım bilgileri
İçeriği Oku →
S
SAYFA
Kimdir?
Cem Seçim Kimdir?
İçeriği Oku →
Ö
ÖNE ÇIKAN
İletişim
TÜBİTAK TÜSSİDE belgeli (yetkili) DDX danışmanı Cem Seçim. DDX raporu, KOSGEB dijital dönüşüm başvurusu, AS 9100 ve yönetim sistemleri danışmanlığı için en...
İçeriği Oku →
S
SAYFA
Yeşil Dönüşüm Destekleri 2026: KOSGEB Yeşil Sanayi ve Bakanlık Yeşil Dönüşüm Programı
KOSGEB Yeşil Sanayi Destek Programı (7 milyon TL, yüzde 70 destek, ön başvuru 9 Aralık 2026) ve Bakanlık Yeşil Dönüşüm Programı: başvuru şartları, puanlama ve i
İçeriği Oku →
Sıradaki içerik yükleniyor...
Keşfetmeye devam edin • 10 içerik önerildi

Aramak istediğinizi üstte yazmaya başlayın ve aramak için enter tuşuna basın. İptal için ESC tuşuna basın.

Üste dön